Precautions for installation of plate heat exchanger

17-02-2021

Through this period of understanding, I believe that everyone is no stranger to plate heat exchangers, but these contents are not enough for customers who want to know more about this product. Today we will share the knowledge about plate heat exchangers with you, hoping to attract everyone's attention, so that everyone has a deep understanding of plate heat exchangers. In this way, when buying and using plate heat exchangers, you can also know it well, and don't panic. I hope to inspire and help you.

1. After unpacking the plate heat exchanger, check item by item according to the packing list. If it does not meet the requirements, the supplier shall solve it in time.

2. The plate heat exchanger is designed with lifting holes for lifting and lifting. Before lifting, please select the wire rope according to the quality indicated on the nameplate.

3. The plate heat exchanger should be placed horizontally, and should be placed in a place where there is no blockage of pipes or other equipment, so that there is about 1 meter of operating space around the equipment for easy maintenance.

4. If the outlet pressure of the plate heat exchanger pump is greater than the pressure of the equipment, please install a pressure reducing valve in the pipeline where the fluid enters the equipment.

5. If the plate heat exchanger is equipped with a pressure control valve, it should be installed on the water inlet pipe of the equipment, not at the water outlet.

6. The inlet and outlet pipes of the plate heat exchanger should be cleaned before installation to prevent sand and gravel, oil pollution, welding debris and other debris from entering the equipment to avoid internal blockage or damage to the plate.


Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy